Record
Companies that think about nature
PlantWe will continue to accompany customers
Year Construction Name Ordering Organization
2018

Saemangeum North-South Expressway Diaphragm Manufacturing

DAELIM C&S

2017

TOWER CRANE MAST Manufacturing

HKTC

2017

TOWER CRANE CLIMBING CAGE Manufacturing

HKTC

2016

PRE SHREDDER Manufacturing Install Construction

SAMBO

2016

FORE MAST Manufacturing Install Construction

HHI

2016

AIR DUCT, WIND BOX Manufacturing Install Construction

KS Construction

2016

TEMPORARY BENT Manufacturing

HUYNDAI S&E

2016

LG Science Sunken stairs Manufacturing

HUYNDAI S&E

2016

Incheon Int Airport Unit Facility Manufacturing

HUYNDAI S&E

2016

C.T Temporary coffering Manufacturing

Eco Ocean C

2016

LG Science Heliport Rail Manufacturing

HUYNDAI S&E

2015

CHS B/E

ILSIN PLANTEC

2015

SAEMANGEUM CHS B/C

ILSIN PLANTEC

2015

GIMPO AIRPORT BOX BEAM

HB STEEL STRUCTURE

2015

CONVEYOR SYSTEM

HYUNDAI E&C

2015

Container Dumping System

SF BOGO PLANT

2014 BAG FILTER Design and Manufacture and Installation SOOLIM Industries
2014 Saemanguem Thermal Power Plant Coal Handling System Manufacturing Doosan Heavy Industries &Construction (ILSIN PLANTEC)
2014 WIND TURBINE MACHIN PART MANUFACTURING HHI
2014 GJEC DESULFUR / DUST TRAPPING FACILITIES MANUFACTURING NATURA (KC Cottrell)
2014 Wind Turbine Tower Manufacturing TAEAN Thermal Power Plant
2013 Pakistan Golen gol build water power plant penstock Manufacturing Construction SAMBU
2013 KUWAIT CONVEYOR SYSTEM Manufacturing Install Construction HUYNDAI E&C
2013 600TON  Ship Loader Speco Heavy Industries
2013 CONVEYOR SYSTEM Manufacturing Install Construction CLEAN MAX
2013  Ssangyong Shipping CSH 1500TON DS Heavy Industries
2013 KNUCKLE PRESS 500TON HAMON KOREA
2012 Brazil CSP Power Plant – Boiler S/S BHI
2012 Andong CCPP HRSG Platform BHI
2012 Dangjin thermal power plant #9,10 Turbine &Electric Electronic Steel frame work Korea East-West Power
2012 2400TON  Ship Loader Speco Heavy Industries
2012 OVER HEAD CRANE 130TON (14) HYUNDAE WIA
2012 Yeosu Napo Port Coal terminal conveyer Manufacturing Install Construction E-Tech
2012 YK-STEEL 120/50TON OVER HEAD CRANE Manufacturing Install HYUNDAI WIA
2011 HYUNDAE-STEEL GAS DUCT Manufacturing Construction DOOSUNG
2011 NGO PROJECT Installed Pipe Construction SH-Enerchem
2011 Okgyeo Mine CRUSHER Building Steel Frame Construction HANLA
2011 Donghae Biomass Power Plant BHI
2011 SinUljin Nuclear Power #1,2 Steel frame work KHNP
2010 80TON  Over Head Crane Speco Heavy Industries
2010 Stacker / Reclaimer (1500/600Ton) / Kuwait SMH
2010 JINWOO STEEL Angang Factory Steel Frame Manufacturing Install MIJIN
2010 Yeongheung Thermoelectric Power Plant #3/4 Coal Facility Construction HYUNDAI SAMHO
2010 Belt Conveyor System / Saudi Speco Heavy Industries
2010 30/5TON GANTRY CRANE Manufacturing Install DOOSUNG
2009 AL Khalij PJT_Steel Structure Manufacturing Doosan Heavy Industries & Construction
2009 BEOMWOO Sacheon Factory 100TON CRANE, 400TON Hand Push Type Car BEOMWOO ENG
2009 Gwang yang Rear Plate Continuous Casting Factory410/110TON R.SHOP #1 CRANE POSCO
2009 Gwang yang Rear Plate Continuous Casting Factory85/15TON TONG #4 CRANE POSCO
2009 Gwang yang Rear Plate Continuous Casting Factory85/10TON TONG #3, #5 CRANE POSCO
2009 Gwang yang Rear Plate Continuous Casting Factory 105/10TON TONG #1, #2 CRANE POSCO
2009 Gwang yang Rear Plate Continuous Casting Factory  100/20TON TUNDISH #2 CRANE POSCO
2009 Preconditioning Process LINE UTILITY SYSTEM (SANDING, ASSEMBLY UNIT) POSCO
2009 Canning Assembling Tartar Walk plate Manufacturing Install Construction Doosaninfracore
2009 Canning Factory Transfer Hand Push Type Car Manufacturing Install Construction Doosaninfracore
2009 Stacker / Reclaimer (1500/750Ton) / Pakistan Speco Heavy Industries
2008 Campiche 250MW Coal-Fired Flectrical Power Plant Steel Structure POSCO E&C
2008 Belt Conveyor System / Saudi Speco Heavy Industries
2008 Belt Conveyor System / Pakistan Speco Heavy Industries
2008 Stacker / Reclaimer (1200/1200Ton) / Saudi Speco Heavy Industries
2008 Stacker / Reclaimer (1500/750Ton) / Saudi Speco Heavy Industries
2008 EMBED Manufacturing Install Construction SECO
2008 YEONGNAM THERMOELECTRIC POWER PLANT LIMESTONE &GYPSUM HANDLING SYSTEM / DUST COLLECTION HALLA Heavy Industries
2008 ULSAN THERMOELECTRIC POWER PLANT GYPSUM HANDLING SYSTEM(200 T/M) DAEWOO E&C